This assignment has a grading rubric, attached.
To learn how to apply SPCM to a process, continue the flowchart from Week 1 and identify variances within a process. You can find variances from the data identified in Week 1.
Complete the Week 2 Statistical Process Control Methods Worksheet, attached.
To begin, measure the entire process over 10-12 periods of time (days, months, years). Use time as your Metric.
Create a control chart including the baseline, upper control limits (UCL) and lower control limits (LCL).
NOTE: Feel free to use estimated time when real data is unavailable.
Submit your assignment using the Week 2 Statistical Process Control Methods Worksheet.
You may include your computations and graphs on the work sheet or attach them separately.
Resources
Microsoft® Word, PowerPoint®, Visio®, or Excel®
https://asq.org/quality-resources/control-chart, attached.
For online help in creating a control chart with upper control limits (UCL) and lower control limits (LCL) there are multiple websites that will walk you through the process. Search, How to create Control Charts.